Taiwan High Speed Rail
Project
This 16km section of the Taiwan High Speed Rail ran through tunnels underneath Taipei. Consisting of twin top down slab track, Auspat used a Hergie Rail Trolley with Leica 1800 Total Stations to achieve the high tolerance results necessary.
Client
Taiwan Track Partners JV
Value
US$110 Million
Duration
March 2003 – March 2006