Airport Roundabout Bridge
Project
The Airport Roundabout Upgrade consisted of a 750 metre four lane bridge (Airport Flyover) linking the East-West Arterial Road and the Airport Drive over Nudgee Road and the Southern Cross Way. Auspat was involved in the construction of the main segmental bridge over Nudgee Road.
Client
Brisbane
Value
$327 Million
Duration
June 2009 – May 2011