South Rd Superway
Project
The project consisted of the construction of a 2.8kms elevated roadway as part of a 4.8kms north-south corridor upgrade from the Port River Expressway to Regency Road. Auspat was involved in all survey works on the project including the detailed construction of the elevated segmental roadway.
Client
Leighton Contractors Abigroup Joint Venture\
Value
$842 Million
Duration
December 2010 – September 2014